Bande intelligente
Product Name:LXTSMB002
MOQ | 100PCS |
samples | customized |
Sample time: | 15 jours |
Customized sample time | 15 days after payment received |
Mass production time | 4-6 days after your sample proved |
Payment term | T/T, Western Union, Paypal, moneygram |
Packing | Each in bubble bag+ inner carton,100pcs/ctn |
Shipping term | DHL,UPS, TNT,EMS, Fedex, by sea or by air |
Logo | Your brand logo or customized logo are welcome |

PCBA Manufacturing Service
1.Leadsintec PCBA Turnkey solution for Smartband PCBA, Box-Build manufacturing service
2.Assemblage PCB, PCB/PCBA Design, PCBA Copy
3.Customized PCBA/OEM/ODM/EMS(Service de fabrication d'électronique)
4.Smt&TREMPER&Pth&BGA Assembly
5.Component sourcing and purchasing
6.Quick PCBA prototyping
7.Test:AOI,In-Circuit Test(TIC),Functional Test(FCT)
8.High mix and low/medium volume are acceptable

Description
PCBA Manufacturing Delivery Duration
La livraison des échantillons sera 10-15 WD after OEM Contact is signed and the Engineering Documents are confirmed.
Pour la production de masse, en fonction des exigences du client, delivery can be done in several steps
Notre équipe d'experts

Parler aux experts
Laissez-nous vous aider à démarrer avec notre service de fabrication d'électronique supérieure (EMS). Vous pouvez nous atteindre par les coordonnées ci-dessous.
Ou vous pouvez remplir le formulaire à droite pour nous atteindre directement, Nous vous répondrons tout de suite.
Coordonnées
:Parc scientifique et technologique de Xingyuan, route Gushu Tongda, ville de Xixiang, district de Baoan, ville de Shenzhen, province du Guangdong, Chine 4 bâtiment、5 bâtiment、6 bâtiment
:Zone A3, zone industrielle de la trêve de Phong Ninh (parc industriel de Nam Giang), ville de Viet An, province de Bac Giang, Vietnam
WhatsApp:+86 15817390087
: +86-15817390087
: +86-755-23108895
: +86-755-29129721
: Victor Zhang
:sales@leadsintec.com
Derniers produits
Blog
SERVICES
SUIVEZ-NOUS
Traduction
Defini comme langue par défaut